A sunken patio,
torn out and repoured.
This Irondequoit backyard patio had settled and cracked past the point of repair. We demoed it, rebuilt the base, and poured a new broom-finished slab — prep to pour in three days, sealed and cleaned up on the way out.
June 2026 · Irondequoit, NY
Rebuilt from the base up.
The scope below is word-for-word what was quoted — because the base is what decides whether a patio lasts.
- Demo and haul away the old sunken patio
- Form and level the new patio
- Lay and tamp a crushed-stone base
- Place expansion joints and wire mesh
- Pour to a broom finish, with joint cuts as needed
- Apply clear sealer and remove all moldings
Removal & repourBroom finish3 days prep-to-pourJune 2026
On the job
How it came together.
Before — worn and settled
Base rebuilt from scratch
Mesh and joints in
Broom-finished and curing
Fresh off the trowel
More projects
Other jobs, same standard.
Want a pour like this one?
Free written estimates, seven days a week — same crew, same standard, your address.